What's the correct formula to use to measure board feet? - ANSWER- W

x T x L/ 12xpcs

or W x Tx L/144 xpcs

What does CSI format refer to? - ANSWER- Splitting up documents for

a construction project into 16 sections.

Vapor retarder is often _____or______ thick plastic sheating. -

ANSWER- 6, or 8 mil

A basement has to have a minimum of what R-Value? - ANSWER- R -

10

A keyway is usually how wide when a 2 x 4 is used to form it? -

ANSWER- 3.5"

What is the notch called in the spread footing? - ANSWER- keyway

What is the fine for failing to provide worker's compensation insurance?

- ANSWER- $1,000 &,or not less than 30 days or more than 6 month for

each day's offense.

A worker's disability extending beyond 7 consecutive days, (not

including the date of injury) must be requested by which form? -

ANSWER- WC-100

There are ______Cubic feet in a cubic yard - ANSWER- 27


Make sure the bottom of your trench is _____? - ANSWER- solid and

stable

How much is paid in worker's compensation ? - ANSWER- Generally,

workers receive 80% of their after tax-wages

In order to be paid for worker's compensation, a worker must have a

wage loss of---? - ANSWER- at least one week.

Worker's compensation is a ? - ANSWER- no-fault insurance.

What should the diameter of a foundation drain pipe be? - ANSWER- 4

inches

Occupation I and I include? - ANSWER- Acute and Chronic.

Part 603, lead exposure is part of what requirement? - ANSWERMiosha

Check your ____ to make sure your corners are square. - ANSWERDiagnals

The main components of a conventional system? - ANSWER- Floor

joists, girder, posts, and columns.

A ________ is an assembly of full length studs @ the corner of a

building. - ANSWER- Corner Post

Plate layout identifies the location of _____? - ANSWER- -Studs in the

wall,

-Location of doors,

-Location of windows.


For underlayment _________ asphalt saturated felt may be used. -

ANSWER- Number 30.

For ice damns, solids sheating should be applied above the laves line to

a point at least ______ inside the interior wall. - ANSWER- 24

When layering wood shingles, how much spacing should be left for

exposure? - ANSWER- 1/4"

Wall studs should be #2 or better SPF @ ________ inches on center,

unless otherwise noted. - ANSWER- 16'

For gutters, once you have a gutter that exceeds ______, you need to put

in an expansion joint. - ANSWER- 60'

Metal gutters slope at least _____ for every ______ towards the

downspout. - ANSWER- 1", 16'

The purpose of a plot and grading plan is....? - ANSWER- To build a

house at the proper elevation for storm runoff.

Who shall promulgate rules according to Act 299? - ANSWER- The

board

Under what conditions can you make non-vented crawl spaces? -

ANSWER- With the proper vapor barrier and insulation.

PACM means - ANSWER- Presumed asbestos containing material.

The two most common kinds of mortar joints are? - ANSWER- Concave

and V joints

What would make a house rack? - ANSWER- Wind

How long is a "lecausre" valid once it's issued? - ANSWER- 3 years


Anchor bolts are supposed to be a max of how many feet apart in MI? -

ANSWER- 6 feet

Presence of bark or lack of wood on the edge or corner is called? -

ANSWER- Wane

Which are the benefits of taking care of our forests? - ANSWER- -

Continued ability to harvest lumbar.

-Protection of important water resources

-Soil conservation

In order to develop a plan you will need to start with what? - ANSWER-

-determine target client

-provide a portion of resources to promote your plan.

-Provide a method of establishing trust

What's the name of the dept. that controls the builder's licencse? -

ANSWER- LARA

Who's required to provide foot protection? - ANSWER- The employee

How big does an opening have to be for MIOSHA to consider it a "hole"

- ANSWER- 2"

How many toilets must be provided for a construction site with 1-20

employees? - ANSWER- 1

How high does a barricade have to be when an employee is working on

a floor below a floor opening (demo on upper floor.) - ANSWER- 42

inches.

If the drop is more than _____ inside a building, only an enclosed

opening on chute shall be used. - ANSWER- 40 ft


No comments found.
Login to post a comment

jordancarter 7 months ago

This study guide is clear, well-organized, and covers all the essential topics. The explanations are concise, making complex concepts easier to understand. It could benefit from more practice questions, but overall, it's a great resource for efficient studying. Highly recommend!
Login to review this item
Q. What will I receive when I purchase this document?
A. You will receive a PDF that is available for instant download upon purchase. The document will be accessible to you at any time, from anywhere, and will remain available indefinitely through your profile.
Q. Satisfaction guarantee: how does it work?
A. Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Q. Who am I buying these notes from?
A. you are buying this document from us learnexams
Q. Will I be stuck with a subscription?
A. No, you only buy these notes for $ indicated . You are not obligated to anything after your purchase.
Q. Can learnexams be trusted?
A. check our reviews at trustpilot
Price $31.00
Add To Cart

Buy Now
Category Exams and Certifications
Comments 0
Rating
Sales 0

Buy Our Plan

We have

The latest updated Study Material Bundle with 100% Satisfaction guarantee

Visit Now
{{ userMessage }}
Processing